Cancel or Change an Order

Last updated:

Personalized orders are full of small details: a grandchild’s name, a wedding date, a photo link copied in a hurry. It is completely normal to spot something you want to fix after you click “Place order”. This page explains how to cancel a Snug Print order or change its details, why the window is 24 hours, what we can change, and what happens if your blanket is already being printed or on its way.

Cancelling or changing at a glance

  • Window: cancel or change within 24 hours of placing your order.
  • How: email support@snugprint.shop with your order number and what you need.
  • What can change: names, dates, captions, photos, design, size, fabric, colour and shipping address.
  • Cancellation refund: the full amount, back to your original payment method.
  • After 24 hours: your blanket is usually in production; you can still return it within 60 days of delivery with a free label.
  • Reply time: within 24 hours on business days.

1. Why there is a 24-hour window

Every Snug Print blanket is printed to order. We prepare orders in 1-3 business days, and once your names and photos have been placed in the design and the throw has been printed, the fabric cannot be reused for anyone else. The 24-hour window gives you a calm stretch of time to read your confirmation email, look at the order notes again with fresh eyes, and tell us about anything you want changed before production goes ahead.

The 24 hours are counted from the time on your order confirmation email, including evenings and weekends. If you order at 9 p.m. on a Friday, you have until 9 p.m. on Saturday to write to us. We may not answer until the next business day, but a request that reaches us inside the window counts.

Time zones are worth a thought for customers in Australia and New Zealand, who are many hours ahead of Illinois. The window is measured from the moment your order was placed, whatever the local time, so an email sent before your next-day equivalent of that time is within it. The time shown on your order confirmation email is the one we go by.

2. How to ask for a cancellation or change

  1. Email us at support@snugprint.shop, or use Submit a Ticket. Put “Cancel” or “Change” and your order number in the subject line.
  2. Say exactly what you need. For a cancellation, a short sentence is enough. For a change, write the corrected text in full, for example “Please change the second name on the family tree from Jayden to Jaden”, rather than “fix the spelling”.
  3. Attach or link new photos if you are replacing a picture. Make sure a shared album or cloud link opens for anyone with the link.
  4. Wait for our confirmation. We reply within 24 hours on business days. Your change or cancellation is final once you receive our confirmation email.

Please send all your changes in one email if you can. Several separate messages about the same order make it easier for a detail to be missed.

3. What can be changed within 24 hours

Changes we can make within the first 24 hours
ChangeExampleEffect on price
Names, dates, captions or verseCorrecting “Grandma’s Gardan” to “Grandma’s Garden”None
PhotosSwapping a blurry screenshot for the original phone photoNone
DesignSwitching from a heart collage to a classic gridDifference charged or refunded
Size50 x 60 in to 60 x 80 in for a bedDifference charged or refunded
FabricFleece to sherpa for a warmer winter throwDifference charged or refunded
Colour (on designs that offer it)Lavender to cream backgroundUsually none
Shipping addressSending the gift to a grandmother’s address instead of your ownNone, shipping stays free

If a change means a higher price, we tell you the difference first and only go ahead once you agree. If it means a lower price, we refund the difference to your original payment method.

The address can only be changed to another address in the United States, Canada, Australia or New Zealand, the four countries we ship to.

4. After the 24 hours

Once 24 hours have passed, your blanket is normally already in production, and we cannot promise to stop it or change it. Please still write to us: if a request reaches us after the window and your blanket has not been printed yet, we will tell you honestly whether anything can still be done.

If your blanket has been printed or shipped, you have not lost your options. Accept the delivery, and you can return it within 60 days of delivery for any reason with a free return label under our Returns & Exchanges Policy. You can then choose a refund, store credit that never expires, or an exchange printed with corrected details.

5. Refunds for cancelled orders

When we confirm a cancellation made within 24 hours, we refund everything you paid to your original payment method within 7 days of confirming the cancellation. Shipping is free on all orders and our checkout does not add sales tax, so the refund equals the order total. How long the refund takes to appear on your statement depends on your bank or payment provider; see our Refund Policy for the full details.

6. Common situations

A misspelled name caught the next morning

You ordered a Grandma’s Garden blanket at midnight and noticed over breakfast that one grandchild’s name was missing a letter. Email us before midnight with the corrected list of names. We confirm the change and print the corrected version.

The photo album link was private

Shared albums are often private by default. If we cannot open your link, we email you; you can also fix it yourself by changing the sharing setting to “anyone with the link” and replying to our email. Preparation time starts once we can see the photos.

A bigger size for a bigger collage

You chose a 30 x 40 in throw for a twelve-photo collage, then realised the faces will be small. Ask us within 24 hours to switch to 50 x 60 in or 60 x 80 in. We tell you the price difference and update the order once you agree.

Changing the delivery address for a gift

You meant to ship an anniversary throw straight to your parents in Auckland but used your own address. Write to us within 24 hours with the full new address, including the postcode.

Ordering the same blanket twice by accident

If you placed two identical orders, tell us which order number to cancel. If you are still within 24 hours of the second order, we cancel it and refund it in full.

A memorial order with a wording change from the family

Families sometimes agree on a verse after the order is placed. If the new wording reaches us within 24 hours, we print the agreed text. Please send it exactly as it should appear, including punctuation, because there is no proof step before printing.

Switching fabric after reading the comparison

You picked fleece for a pet portrait blanket, then read the “Fleece or sherpa?” comparison and decided the thicker sherpa back would suit winter evenings better. Ask within 24 hours; we tell you the price difference and update the order once you agree. If you would rather keep fleece for the dog bed and add a sherpa one for the sofa, simply place a second order.

Changing your mind about a gift entirely

If you decide within 24 hours that a different gift would be better, ask us to cancel. You receive a full refund, and you are free to come back and order another design whenever you are ready.

7. What happens to your order, hour by hour

It can help to picture where your order is when you write to us. The table below shows the usual path of a Snug Print order and what we can still do at each stage.

Order stages and your options
StageWhenCancel?Change details?
Order placed, confirmation email sentMinute 0YesYes
We read your order notes and open your photo linksWithin the first business dayYes, within 24 hoursYes, within 24 hours
Waiting for a working photo link or missing detailUntil you replyYes, within 24 hours of orderingYes, send the missing detail
Design set up and blanket printedWithin 1-3 business daysNot guaranteed after 24 hoursNot guaranteed after 24 hours
Packed and handed to the carrierAfter preparationNo; use a return insteadAddress changes may no longer be possible
DeliveredAbout 7-14 business days in transitNo; return within 60 daysReprint via exchange

8. Partial changes to orders with several blankets

If your order contains more than one blanket, for example three family tree throws for three households, you can cancel or change just one of them within 24 hours. Tell us which blanket by its design and the names on it, so there is no confusion between similar items. The other blankets continue as normal, and we refund or charge only the difference for the one that changed. Shipping stays free whatever the number of blankets.

9. If you are not sure yet

Sometimes you are waiting on a detail: the exact spelling of a new baby’s middle name, the date of a ceremony, or a better photo from a cousin. You do not need to rush the order. You can wait to order until you have everything, or place the order and send the final detail within 24 hours. If the detail will take longer, it is usually kinder to cancel within the window and reorder later than to have the blanket printed without it, because there is no proof step and we print exactly what we receive.

10. Changes we cannot make

  • Shipping to a country outside the United States, Canada, Australia and New Zealand.
  • Faster or express delivery, or a guaranteed arrival date; delivery estimates are in Shipping & Delivery.
  • A proof or mockup to approve before printing.
  • Printing content you do not have the right to use, such as song lyrics, logos or characters owned by others.

11. When we cancel an order

Very occasionally we may need to cancel an order ourselves, for example if we cannot open the photos and do not hear back from you, if a photo or text cannot be printed for rights reasons, if a price was shown in error, or if a payment cannot be confirmed. If that happens, we email you to explain and refund the full amount you paid.

12. Before you order: a short checklist

  • Read every name, date and caption in your order notes once more, letter by letter.
  • Open your photo link in a private browser window to check it works for anyone with the link.
  • Check the size against the Size Guide and the fabric (fleece or sherpa).
  • Confirm the shipping address, especially for gifts sent straight to the recipient.
  • Keep your order confirmation email; it has the order number we need.

13. Contact us

Need to cancel or change something? Email support@snugprint.shop with your order number as soon as you can, ideally the same day. You can also check the status of your order on Order Tracking or browse the Help Center. We reply within 24 hours on business days.

Snug Print, 716 Liberty Bell Ln, Libertyville, IL 60048, US.